# Triomed stays inspection-ready and ships faster

Triomed builds dialysis technology inside strict regulatory expectations. Compliance can't slow the team down, and it can't slip.

- **Industry**: Medical devices, dialysis
- **Team**: Regulated team, 4 sites
- **Outcome**: Shorter release cycles

## The challenge

- Living inside FDA, ISO 13485, and 21 CFR Part 11 expectations across four sites made every release heavy with sign-off overhead.
- The quality team needed to be inspection-ready at any moment, without release cycles grinding to a halt.

## How neo helped

- neo's closed-loop approval flow routes every change through the configured chain with validated electronic signatures.
- Complete audit trails and release dossiers that assemble themselves keep Triomed audit-ready without extra work.

## Results

- **Shorter** release cycles
- **4 sites** kept in sync
- **Always** inspection-ready

> Our quality team is always inspection ready. neo's closed-loop approval flow has meaningfully cut our release cycles.
>
> Triomed quality team
